1) Page FP2 indicates the ware house is NIC. The warehouse is covered under the scope of the master permit. 1:13.3.3.4.1.6
a)Provide letter from the owner and sealed by designer articulating storage method, arrangement, height, commodity and packaging in the storage/warehouse area (including mezzanine). This will need to be provided to sprinkler contractor and turned in to our office for the record.
b) Provide a letter from either a sprinkler engineer or contractor confirming that the existing sprinkler design/hazard class will still protect this warehouse with the intended/desired storage use described by the owner.
NOTE: IF the existing sprinkler hazard class can not protect the intended storage method have sprinkler engineer or contractor guide you on alter method of storage that will meet the existing sprinkler hazard class.