Plans for a 450 head NFPA 13 wet aboveground fire sprinkler system for a large ALF.  The underground is previously approved.  The system is designed with LH and OH remote areas.   


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

10/27/2021 PWebb

1) The Sprinkler EOR plans submitted with the shop drawings sealed by Ryan L. Chewning PE. show the FDC mounted on the building and show the use of sidewall heads in the units.  The shop drawings show a yard FDC and pendent heads in the units.  The two must match or the procedures in FAC must be followed.  Note: The approved underground plan shows the FDC off the building. 

 

Florida Administrative Code (FAC) 61G15-32.002 defines a material deviation as "Any deviation from the design parameters established and documented by the Engineer of Record." Furthermore FAC 61G15-32.003(6) states "When layout documents contain material deviation from the Engineer of Record's Fire Protection System Engineering Document, such layout documents are not compliant unless they are accompanied by revised Engineering Documents made and sealed by the Engineer of record for the Fire Protection System."

-------------

FDC shown on the building, however the approved underground plans show it as a yard FDC.  PJW Tuesday, October 26, 2021

10/27/2021 PWebb

2) The plans indicate no sprinklers under several exterior projections citing 8.15.7.3 of NFPA 13.  Provide specifications for the exposed finish material and indicate whether it is non combustible, limited combustible, or fire retardant treated wood. 

------------

RTC references locations in the originally approved construction plans that indicate the construction method of the projections. In addition specifications for the materials have been provided.  PJW Tuesday, October 26, 2021

10/26/2021 PWebb

3) How will the attic and exterior projections be maintained above 40 degrees?  NFPA 13:8.16.4. 

-------------------

The RTC indicates that attic and overhangs will have R38 insulation and batt insulation to maintain the temperature above 40 degrees.  Also a letter has been provided from the design professional.    PJW Tuesday, October 26, 2021

10/26/2021 PWebb

4) Provide plan cross section/ elevation views for the upper level in accordance with NFPA 13:23.1.3(4).   The lower level has been provided. 

----------------

This has been provided.  PJW Tuesday, October 26, 2021

10/26/2021 PWebb

5) TY3235 spec sheet has been provided (dry pendant) but I do not see that head indicated on the plan head legends. 

-----------

Per RTC, this head was removed from the scope of this project.  PJW Tuesday, October 26, 2021

10/26/2021 PWebb

6) The attic head symbols used on the plan are a circle with a single line through it, and 2 circles with an "x" through them one of which protrudes past the circle.   The legend does not show the circle with a dash.  Ensure that the symbols match and ensure that all heads are represented on the legend. 

------------

The head symbols have been clarified.  PJW Tuesday, October 26, 2021

10/26/2021 PWebb

7) Verify all attic head coverage and demand in accordance with the specs.  I am unable to verify this until the symbols are cleared up.  Ensure that all specs are included. 

10/26/2021 PWebb

8) Storage 1010 (riser location) is not climate controlled.  How will the riser be maintained above freezing?

------------

Riser has been relocated to Mechanical room 1011.  PJW Tuesday, October 26, 2021

10/26/2021 PWebb