SJC Home
Clearance Sheet C2020-004494*002

 Department IssuesSigned OffIntl

Plan reviewed for revision to approved plans for CO2 installation. Sheet A-1 provided.

Reviewed using FFPC 7th edition effective Dec. 31, 2020. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.

Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  

Tuesday, June 7, 2022, 7:47:06 AM: Spoke with Jim Johnson regarding the number of monitors and strobe locations. Per Jim, the CO2 liquid line will go from the CO2 Tank to the Bag n Box and another line will go to the bar for the margarita machine. Jim is going to get with the business and confirm if there will be a second CO2 line to the bar and adjust the plans accordingly.

I will hold the plans until Wednesday (06/8/22) COB before forwarding them to the clerk for processing.

 

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the Permit Center.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit.
C. Provide a response to comments along with any supporting documentation.  Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)

 

1) Sheet identifies the CO2 tank outside the kitchen wall with line to Bag-n-Box inside the kitchen. The Control unit is located in the hazard are adjacent to the kitchen office.

Move the control unit outside the kitchen adjacent to the double swing doors. Add appropriate signage and notification device(s).

 

2) Provide manufacturer spec sheets for the control unit, monitors and strobes.

 

3) Provide signage elevations for review.