| | Department Issues | Signed Off | Intl |
|
|
1) The foundation plan does not address the interior load bearing walls per the truss lay-out ( 2- copies required )
|
9/28/2020
| jadams |
|
|
2) The electrical plans need to address occupancy sensors per FBC Energy Conservation C405.2.1 , Identify location of meter and panels on plans.
|
9/28/2020
| jadams |
|
|
3) provide a plumbing plan with riser diagram
|
9/28/2020
| jadams |
|
|
4) Provide a mechanical plan showing location of equipment ,duct size and lay-out , and ventilation
|
9/28/2020
| jadams |
|
|
5) no attic access shown ( is this going to be used for storage )
|
9/28/2020
| jadams |
|
|
6) Page A-4 does not address ceiling insulation
|
9/28/2020
| jadams |
|
|
7) how are the ceiling trusses attached to the metal building
|
9/28/2020
| jadams |
|
|
8) Elevation plans are required ( front ,sides and rear )
|
9/28/2020
| jadams |