Clearance Sheet C2020-003599*007

 Department IssuesSigned OffIntl

#1

need signed approved clearance sheet with attached site plan

 

#2

need eng truss drawings with eor review stamp

 

#3

sheet ls0.2 does not show food storage bldg.#4 / bldg. #1 a separate bldg [ correct all plan sheets that indicate bldg. 1 not a separate bldg

 

#4

sheet lso.2 lists 22727 sq ft ; application lists 19300 sq ft / plumbing plans mix fixtures in bldgs.

 

#5

po.1 lists 4 bldgs. plans ; applications ; clearance sheets list 3 & a food storage bldg

 

#6

occupant loads for bldg. #1 incorrect / one separate blg.

 

#7 energy sheets list 2698 kennel staff on one set and 3790 on second for mega kennels [ one separate blg not 2

 

#8

all elec panels need designated areas they serve / control marked

 

#9

voltage drop calculations required per energy code 405.6.3 / bldg. #1 one bldg

 

#10

 all sheets that list sq. ft. ; bldgs. ; and occupant loads incorrect need correct on applications , plans

 

#11

 lightning protection systems on all bldgs. noted require  separate entity approval prior to final to owner operator

 

#12

 elec plans not clear 2 separate grounding systems will exist

 

#13

 provide written summary of all review comments / note plan sheets corrected and resons