| | Department Issues | Signed Off | Intl |
|
|
#1
need signed approved clearance sheet with attached site plan
|
| |
|
|
#2
need eng truss drawings with eor review stamp
|
| |
|
|
#3
sheet ls0.2 does not show food storage bldg.#4 / bldg. #1 a separate bldg [ correct all plan sheets that indicate bldg. 1 not a separate bldg
|
| |
|
|
#4
sheet lso.2 lists 22727 sq ft ; application lists 19300 sq ft / plumbing plans mix fixtures in bldgs.
|
| |
|
|
#5
po.1 lists 4 bldgs. plans ; applications ; clearance sheets list 3 & a food storage bldg
|
| |
|
|
#6
occupant loads for bldg. #1 incorrect / one separate blg.
|
| |
|
|
#7 energy sheets list 2698 kennel staff on one set and 3790 on second for mega kennels [ one separate blg not 2
|
| |
|
|
#8
all elec panels need designated areas they serve / control marked
|
| |
|
|
#9
voltage drop calculations required per energy code 405.6.3 / bldg. #1 one bldg
|
| |
|
|
#10
all sheets that list sq. ft. ; bldgs. ; and occupant loads incorrect need correct on applications , plans
|
| |
|
|
#11
lightning protection systems on all bldgs. noted require separate entity approval prior to final to owner operator
|
| |
|
|
#12
elec plans not clear 2 separate grounding systems will exist
|
| |
|
|
#13
provide written summary of all review comments / note plan sheets corrected and resons
|
| |