Clearance Sheet C2020-003599*006

 Department IssuesSigned OffIntl

This review covers Building 4 which is the food storage building.

Plan reviewed for 948sf construction type Vb fire sprinklered(?) animal housing storage building for food. Designer classified this building as class 1 category b animal housing storage building. Reviewed new 948sf storage building using FFPC 6th edition effective Dec. 31, 2017.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

NOTE: 1 set of plans for 4 separate clearance sheets: C20-1810 22727sf kennel Building 1, C20-1811 4284sf Vet Building 2, C20-1812 3198sf Quarantine Kennel Building 3, C20-1813 948sf Food Storage building 4.

Thursday, March 4, 2021 Upon resubmittal the following was not submitted: N20-1811 4284sf Vet Building.

This set of plans is for c20-3599*7 staff/training building, c20-3599*2 kennel C, c20-3599*1 kennel B, c20-3599*6 food storage B2, c20-3599*5 quarantine kennel. This review is now for 3090sf construction VB fire sprinklered building. It was classified as class II type B animal housing facility in accord with NFPA 150. They have also resubmitted using 7th edition of FFPC.

 

RESUBMITTING:  Please make necessary changes and resubmit the complete permit application package. We do not accept responses to comments/ plans/ specifications through email. Contact Building department for resubmittals.

To help speed the review process you should include a written comment response summary to clarify or illustrate corrections on plans (bubbling, highlighting or notations are best).  Please use the Florida Fire Prevention Code 6th Ed for all code reference in a response to comments. The fire plans examiner does not use the Florida Building Code. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

 

1) This is a preliminary review. Do not resubmit until clearance sheet obtained.

NOTE: Based on fire's site review, additional comments may be provided.

3/8/2021 VVitori

2) Since one pair of plans submitted for 4 separate clearance sheets, this comment will be signed off once all clearance sheets have all fire plan review comments addressed.

C20-1810 22727sf kennel Building 1, C20-1811 4284sf Vet Building 2, C20-1812 3198sf Quarantine Kennel Building 3, C20-1813 948sf Food Storage building 4.

Monday, March 8, 2021 This set of plans is for c20-3599*7 staff/training building only, c20-3599*2 kennel C, c20-3599*1 kennel B, c20-3599*6 food storage B2, c20-3599*5 quarantine kennel.

 

3) Is this building to be fire sprinklered?  Make sure information throughout plan pages match.

NOTE: LS0.4 and FP1.1 (sprinkler design criteria) shows it is fire sprinklered. Page 8 of Comm20-13 does not show this building sprinklered.

Monday, March 8, 2021 Building sprinklered. Information matches.

3/8/2021 VVitori

Page E0.2 calls for lightening protection. At this time the fire department will not review or inspect this type of system. This office requires a 3rd party inspection. Remember installation is required to meet NFPA 780 and UL 96A. The installing contractor will be required to provide certification to the fire inspector at the time of fire final indicating compliance with NFPA 780 and UL96A was met.

3/8/2021 VVitori

4) Looking at page E5.4, it is not clear if this building is to have a fire alarm system (especially since it is also showing that it is to be fire sprinklered). Clarify on E5.4 which buildings are to have fire alarms. Make sure one can determine which sections of design criteria apply to which building.

NOTE: If there will be a fire alarm in this building I will then review design criteria.

Monday, March 8, 2021 E5.4 indicates all buildings.

3/8/2021 VVitori

5) There is no emergency light in the immediate vicinity of the only exit door that is being equipped with access controlled egress hardware. 101:7.2.1.6.2(7)

Monday, March 8, 2021 Page E1.4 still does not show an emergency light in immediate vicinity. Closest em light is 20' away.

Tuesday, May 25, 2021 Page E1.4 still does not show an emergency light in immediate vicinity. Closest em light is 20' away.

 

Page E1.5 indicates that motion sensors will be used in the areas of egress. At time of fire final be prepared to show compliance with NFPA 101 7.8.1.2.2:

(1) switch controllers must be listed (2) switch controllers equipped for fail-safe operation and evaluated for this purpose (3)  timers be set for a minimum 15 minute duration. (4)  motion sensor be activated by any occupant movement in the area served by lighting units (5) If building has a fire alarm, activation of fire alarm must activate the switch controller (6)  lighting control device may not turn off any lights realized upon for activation of photo luminescent exit signs or path markers (7) Lighting control devices may not turn off any battery equipped emergency luminaries, unit equipment or exit signs

3/8/2021 VVitori

At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- wall and ceiling finish will meet Class A, B or C. 101:42.3.3.2.  150:10.1.1.2

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.

3/8/2021 VVitori

At least 1 2-A:10-B:C extinguisher shall be provided. 150:9.4.2

3/8/2021 VVitori