| | Department Issues | Signed Off | Intl |
|
|
#1
need signed / approved clearance sheet with attached site plan
|
| |
|
|
#2
need eng. truss drawings with eor review stamp
|
| |
|
|
#3
sheet ls0.1 lists bldg.#3 as 2971 sq ft + 622 = 3593 / application lists 3198
|
| |
|
|
#4
per nec 110.24 service equipment shall be marked with the max. fault current available
|
| |
|
|
#5 all elec panels need designated areas they serve / control marked
|
| |
|
|
#6
per fmc 401.6 contaminants cannot be recirculated
|
| |