Clearance Sheet C2020-003599*001

 Department IssuesSigned OffIntl

Plan submitted for 89 total devices between all 5 buildings. This fire alarm permit will only cover the 34 devices in mega kennel b. Reviewed using FFPC 7th edition effective January 1, 2021.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

11/29/2021 PWebb

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.

To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

11/29/2021 PWebb

1) Do not see where backflow is electronically supervised. EOR of sprinkler on required this on FP1.1 and required by 101:42.2.4.1 101:42.2.5  101:38.2.5.2.1  101:38.2.5.3.1.

--------------

The site plan sheet FA.05 indicates that the backflow preventer will be monitored by input module in staff kennel building per RTC. PJW Monday, November 29, 2021.  

 

11/29/2021 PWebb

2) Do see where standard illumination of lighting sensors will be tied in to illuminate egress when alarm activates. 101:7.8.1.2.2

----------------

The RTC indicates that this will be accomplished.  I spoke to the designer Zach, at this time he is uncertain exactly how the automatic lighting will be setup.  He understands what is required to be accomplished by activation of the fire alarm and will ensure that it will take place.  We will verify at the time of final.  PJW Monday, November 29, 2021 

 

11/29/2021 PWebb

3) This building has access controlled egress which is required to release with fire alarm activation. Show these doors being tied in for release. 101:38.2.2.2.6  101:42.2.2.2.3

-----------------

Addressable relays added to the affected doors for release.  PJW Monday, November 29, 2021

 

11/29/2021 PWebb

4) Submit fire alarm permit application for each building.

11/29/2021 PWebb

5) Do not see location of controls and annunciation is provided in this building. 101:9.6.6 and 101:9.6.7.7

-------------

Annunciator with control capability added to the plans.  PJW Monday, November 29, 2021

 

11/29/2021 PWebb