| | Department Issues | Signed Off | Intl |
|
|
Plan submitted for 45 heads NFPA 13 sprinkler system. Reviewed using FFPC 7th edition effective January 1, 2021.
Reviewer: V.Vitori 904 209 1748
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
NOTE: no spec sheets provided for flex heads, Sin RA7216
|
| |
|
|
RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.
To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.
The numbered items require a response or plans to be updated to complete the review.
|
| |
|
|
1) No sprinkler or site underground permit applicant and plans has been submitted yet. Have underground contractor submit.
|
| |
|
|
2) Page received is FP4 (only head layout). Is this the only page? Where is riser elevation? Where is inspectors test? Where is the FDC? No building elevation.
A complete review can not be conducted.
|
| |
|
|
3) FP2 shows flex assembly heads will be used. Provide spec sheet for suspended ceiling tile grid showing it meets ASTM C 635. 13:9.2.1.3.3.2
|
| |
|
|
4) How will piping in attic be protected against freezing?
|
| |
|
|
5) Hydraulic calculations shows attic remote area 1 as being calculated using 1077sq ft . EOR on FP1.1 requires 1500 sq ft with 30% added for sloped roofs with a pitch greater than 1 in. 6." Update calculations.
|
| |
|
|
6) Hydraulic calculations for southend of building area 2 indicates area of application is 1514sf. EOR on FP1.1 indicates 1500sf over most remote area for building.
|
| |