Plan reviewed for revision to 40 of 76 original pages (cover, A1.01,A2.01, A2.1, A2.11, A2.12, A2.51, A3.01, A4.51, A5.01, A5.51, A5.52, A5.53, A6.01, A6.02, A6.03, A6.04, A8.01, A8.02, S1.01, S1.02, S1.03, S2.02, S3.01, S5.02, S6.02, S6.03, S7.01, M1.01, M1.02, E0.01, E.02, E0.03, E0.05, E1.00, E2.01, E2.02, E3.01, E3.02, E3.03). Scope of changes: "value engineering changes". Reviewed using FFPC 6th edition effective Dec. 31, 2017.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

NOTE: Any site changes need to go back through site review.

Page E0.05 shows FM200 fire suppression system being added according to FA design criteria.

 

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.

To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 6th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

 

1) Page A2.01 , partition wall change for 1st floor studio 127 no longer shows it will be wall type 3.1 (fire rated wall) and now shows it as a wall type 4 (just sound attenuation wall). How is this wall no longer rated?

 

2) Page A6.03 shows you are changing the balcony guards from glass infill to horizontal cables.

a) confirm the cables will not let a 4" sphere  pass through any of the openings. 101:7.2.2.4.6.3

b) confirm you are ok with horizontal cable runs vs the vertical recommended to prevent climbing. 101:A.7.2.2.4.6.3

 

3) Page E0.05 shows a FM200 suppression system is now being added.

a) where is zone 1 and zone 2?

b) why does zone 2 smoke not actuate audible and visual signal like zone 1?

NOTE: A hold for this suppression system submittal has been added at 109-Insulation.