SJC Home
Clearance Sheet C2019-006879

 Department IssuesSigned OffIntl

Plan reviewed for new fire sprinkler system monitoring FACP; Potter Model PFC-6006. Teleguard TG-7FS Cellular Dialer.

Reviewed using FFPC 6th edition effective Dec. 31, 2017.

Reviewer: D. Feagle 904-209-1721

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

************************

Friday, October 9, 2020 DF: Flare alarm re-submittal. All plan pages are new.

Plans are APPROVED.

10/9/2020 dfeagle

RESUBMITTING:  Please make necessary changes and resubmit the complete permit application package. We do not accept responses to comments/ plans/ specifications through email. Contact Building department for resubmittals.

To help speed the review process you should include a written comment response summary to clarify or illustrate corrections on plans (bubbling, highlighting or notations are best).  Please use the Florida Fire Prevention Code 6th Ed for all code reference in a response to comments. The fire plans examiner does not use the Florida Building Code. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

10/9/2020 dfeagle

1)  The EOR Fire Alarm Design Criteria noted in building permit 12000887, page E302, Fire Alarm System Design; A through O design criteria notes under (F) 4 zones. Zone 1 - Pull Station, Zone 2 - Flow/Tamper, Zone 3 - Duct Smoke Detectors,  Zone 4 - (3) Kitchen Hoods.

The fire alarm plans accompanying this application do not match the EOR's Design Criteria and Fire Alarm Matrix.

Florida Administrative Code (FAC) 61G15-32.002 defines a material deviation as "Any deviation from the design parameters established and documented by the Engineer of Record." Furthermore FAC 61G15-32.003(6) states "When layout documents contain material deviation from the Engineer of Record's Fire Protection System Engineering Document, such layout documents are not compliant unless they are accompanied by revised Engineering Documents made and sealed by the Engineer of record for the Fire Protection System."

10/9/2020 dfeagle

2)  PFC 6006 Panel Riser detail on page FA-2 of 2 indicates a water flow bell. I did not see this device in the drawings. No product specifications provided.

Friday, October 9, 2020 DF:  Water flow bell removed. System has a horn/strobe inside the riser room.

10/9/2020 dfeagle

3)  No product specifications provided for the cellular radio network - Teleguard TG-7FS.

Friday, October 9, 2020 DF: Did not receive the cellular dialer specification sheet. Spoke with Michael Griffis with Aegis Fire and he will email me the specification sheets. Will hold permit until Monday 10/12/2020 0800 hrs. to receive the documentation.

Friday, October 9, 2020 DF: Received specification sheets via email.

 

10/9/2020 dfeagle