| | Department Issues | Signed Off | Intl |
|
|
Plans for a 132 head NFPA 13 fire sprinkler system for a retail shell addition (3 units). The plans indicate 2 risers supplying the addition fed by an 8" Main that is supplied by an existing 80 psi diesel fire pump. This plan is for the aboveground only. The system is designed as Ordinary Hazard Group II .20 density over 1500sf. The plans are NOT APPROVED for the following reasons:
----------
Plans APPROVED. PJW Wednesday, March 04, 2020
Reviewed using FFPC 6th edition effective Dec. 31, 2017. Reviewer: PJ Webb 904 209 1744 To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
|
3/4/2020
| PWebb |
|
|
Number 6 on the sprinkler design criteria by James M. Curtis PE indicates that "layout documents shall be submitted to the Engineer of Record for verification of compliance". Submit plans indicating approval from the EOR. This is an approval stamp, I am not requiring the plans to be sealed.
------------
Plan submitted electronically sealed by the EOR. Note the electronic seal indicates that the seal is not valid if printed. I can accept this as an approval of the plan from the EOR. But I will not accept the electronic seal if the document was required to be signed and sealed. Please note this for future submittals. PJW Wednesday, March 04, 2020
|
3/4/2020
| PWebb |
|
|
Sprinkler criteria (D) indicates maximum 130sf sprinkler head spacing. The plans show 256sf spacing.
---------------
Plans approved by EOR. PJW Wednesday, March 04, 2020
|
3/4/2020
| PWebb |
|
|
The sprinkler criteria appears to reference only a single riser, whereas the plan was submitted with 2 risers (one in the riser room, and one in suite JR106. In addition the approved DRC site plan indicates 3 risers, one for each suite. Ensure that the EOR in on board with 2 risers. (His approval of the shop drawing will demonstrate this)
-----------
Plan shows 2 risers approved by the EOR. This matches the submitted underground. PJW Wednesday, March 04, 2020
|
3/4/2020
| PWebb |
|
|
Info only
An electrical heater is provided for the riser room as noted on sheet E1.1 of the approved building plans.
|
1/17/2020
| PWebb |