Plan submitted for a new aboveground only nfpa 13 wet and dry system with a total of 289 heads. Reviewed using FFPC 6th edition effective Dec. 31, 2017.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Wednesday, April 8, 2020 A new aboveground only nfpa 13 wet system with a total of 291 heads.

4/8/2020 VVitori

RESUBMITTING:  Please make necessary changes and resubmit the complete permit application package. We do not accept responses to comments/ plans/ specifications through email. Contact Building department for resubmittals.

To help speed the review process you should include a written comment response summary to clarify or illustrate corrections on plans (bubbling, highlighting or notations are best).  Please use the Florida Fire Prevention Code 6th Ed for all code reference in a response to comments. The fire plans examiner does not use the Florida Building Code. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

4/8/2020 VVitori

1) The engineer of record for this fire protection system, who set forth the sprinkler design criteria is Matthew D Lewis. The shop drawings were submitted with a seal from Suzanne LeVisureur. Per FAC 61G15-32.002(5)(6) after the Fire protection system engineering documents (Criteria) is submitted with the building plans, the shop drawings, when submitted, require no additional engineering input or seal.

Please either:  2) Have Suzanne LeVisureur submit a registered letter to Matthew D Lewis notifying to reuse the already sealed contract documents therefore assuming all legal responsibility for the system in accordance with FAC 61G15-27.001. or 3) Have the owner or project engineer submit a letter to our office completely removing Matthew D Lewis as engineer of record for the project. or 4) Have the engineer of record provide a note on the shop plans they approve for design requirements and performance only.

A couple of discrepancies from design criteria to shop drawings: - Wet system only with attic insulation FP0.1. - FDC is part of underground.

Tuesday, April 7, 2020 Received a whole new set of plans signed/sealed by EOR Matthew D Lewis with new hydraulic calculations. Received no new spec sheets. Old specs showed Tyco heads and new plans show Globe.

I called contact, Andy to see if he would email all spec sheets.

4/8/2020 VVitori

Unable to locate reference on plans or on equipment spec sheets that a relief valve or auxiliary air reservoir is going to be used on the wet system. Have spec sheet on site at time of fire final including the device installed. 13:7.1.2

4/8/2020 VVitori