| | Department Issues | Signed Off | Intl |
|
|
Plans for a underground fire main for Building 1 that begins at the 6" backflow preventer (off of the 8" site main) and includes approximately 120' of 6" DR18 pipe, tying into a stainless steel riser sweep terminating 1'AFF. The FDC is a yard FDC tied into the underground main. The underground is included on a single set of plans with the site private mains and building 2 underground, so I have included the comments for the entire project under both building reviews.
New Comment: I attempted to contact the plan contact with questions Monday 10/18 but never heard back. PJW Wednesday, October 20, 2021
Reviewed using FFPC 7th edition effective Dec. 31, 2020. Reviewer: PJ Webb 904 209 1744 To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
|
10/26/2021
| PWebb |
|
|
RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.
To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.
The numbered items require a response or plans to be updated to complete the review.
|
10/26/2021
| PWebb |
|
|
1) Indicate the pipe depth of cover per NFPA 24:4.1.3 (8)(H) in accordance with NFPA 24:10.4.2.2.
--------------
I do not see any indication or note of pipe depth. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
2) Identify the pipe lengths on the plans per NFPA 24:4.1.3 (8)
-----------------
I do not see any indication on the plans or notes of pipe length per the above. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
3) Provide hydraulic calculations demonstrating that the proposed mains can supply the total demand. NFPA 24:5.2.1
----------
Calculation provided sealed by Michael S. Shaw PE with Prosser. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
4) FDC connection on piping up to 2 inches shall be equipped with a Double Clapper Siamese Connection.
FDC connections on piping LARGER than 2 inches shall be equipped with a five (5) inch Storz connection and shall have a 30 degree downward deflection.
This applies to all FDC’s regardless being on a building or free standing.
NFPA 24:5.9.1.2, and 5.9.2.4
--------------
Note added to FDC detail indicating the above but shows standard Siamese. Ensure that Storz is installed, we will verify this at the time of final. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
5) Provide plan details for the fire hydrants and Fire Department connections. Ensure hydrant detail is in compliance with NFPA 24 :7.3.
--------------
FDC detail was added, see comment 4 response. The hydrant detail does not show the slab as required by the above section. Only gravel for drainage is shown. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
6) I did not see an automatic drain valve indicated on the plans or specs for the FDC. NFPA 24:5.9.4.1. Show on FDC detail as well.
------------
Do not see the drain valve indicated by detail or by note. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |
|
|
7) Show on the plans how the backflow preventers (3) will be protected from freezing. NFPA 24:6.5.2. This is indicated on the plan for the 8" backflow, but not the 2, 6 inch. Provide specifications for the method used.
--------------
Plans now indicate that the backflow preventers will all be insulated to protect with freezing. I still need the specification sheets for the insulation. I do not see them contained in the permit package. PJW Wednesday, October 20, 2021
---------
Information for armaflex insulation provided. PJW Tuesday, October 26, 2021
|
10/26/2021
| PWebb |
|
|
8) Is the WATTS LF757DCDA being used at all 3 locations?
-----------------
Not answered. I have specification sheets for 3 different backflow preventors. The Watts Series 957, The Watts series LF757DCDA, and contained in the hydraulic calculations is the Master Series 856ST. Identify which one(s) will be used and where. PJW Wednesday, October 20, 2021
----------------
The plans show that the WATTS 757 will be installed at all 3 locations. PJW Tuesday, October 26, 2021
|
10/26/2021
| PWebb |
|
|
9) License
Our records indicate that the Class V license for Horace B. Clark is expired. Provide current class V license or have a currently licensed contractor submit for permit. Contact a fire permit technician for further information.
-------------
Updated license information provided. PJW Wednesday, October 20, 2021
|
10/26/2021
| PWebb |