Clearance Sheet C2019-001098

 Department IssuesSigned OffIntl

#1

per fbc chapter one a life safety plan is required / egress arrows & exit directional signage

5/8/2019 fbecza

#2

per fac 216.3 signs are required to direct customers & visitors to interior facilities & spaces

 

#3

need hvac drawing with supplies and returns in new & renovated spaces

 

#4

need locations of electric panels [new panel] on plans not loose 8.5 x 11

 

#5

per nec 110.24 elec. equip. shall be marked with the max. fault current available

 

#6

per fmc401.6 contaminants cannot be recirculated / duct & exhaust need to show that