SJC Home
Clearance Sheet C2018-007681*002

 Department IssuesSigned OffIntl

#1

need energy sheets / per fec 405 lighting controls ; sensors required in all rooms including rest rooms

 

#2

need signed sealed plan sheets where title block list architect

 

#3

per fac signs are required to direct customers & visitors to interior spaces / rest rooms

 

#4

per fac all rest rooms on an accessible route must be accessible

 

#5

need accessibility detail sheet with all clearances , heights , reaches & turning radius

 

#6

all exit access , path of travel & signs not shown

 

#7

 need walk in cooler drawings

 

#8

 need new ,existing outlets & lighting shown on electric plans

 

#9

need load calculations & panel schedules on electric plans

 

#10

need grease interceptor detail on plans with sizing calculated

 

#11

 need under slab grease line show on riser diagram

 

#12

per fpc 802.1.1 each well of a multiple compartment sink shall discharge independently to a waste receptor [floor sink]indirect waste