| | Department Issues | Signed Off | Intl |
|
|
#1
NUCOR PRE-ENGINEERED BUILDING PLANS NEED EOR SIGNITURE
|
| |
|
|
#2
APPLICABLE CODES NEED 2014 NEC / CURRENT CODE IN EFFECT
|
| |
|
|
#3
PER NEC 110.24 SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED WITH THE MAXIMUM FAULT CURRENT AVAILABLE
|
| |