SJC Home
Clearance Sheet C2018-002141

 Department IssuesSigned OffIntl

#1

 need approved clearance sheet

5/16/2018 fbecza

#2

need pre-fabricated awnings signed sealed plans

5/16/2018 fbecza

#3

per nec 210.62 show windows require outlets 18" of top and each 12' or 1 per window

5/16/2018 fbecza

#4

per nec 110.24 service equipment shall be legibly marked with the maximum fault current available

5/16/2018 fbecza