| | Department Issues | Signed Off | Intl |
|
|
#1
need approved clearance sheet
|
5/16/2018
| fbecza |
|
|
#2
need pre-fabricated awnings signed sealed plans
|
5/16/2018
| fbecza |
|
|
#3
per nec 210.62 show windows require outlets 18" of top and each 12' or 1 per window
|
5/16/2018
| fbecza |
|
|
#4
per nec 110.24 service equipment shall be legibly marked with the maximum fault current available
|
5/16/2018
| fbecza |