Clearance Sheet C2018-002140

 Department IssuesSigned OffIntl

Plan reviewed for revision. Revised pages: A0.0, A.02, A1.1, A1.2, A4.1, A7.1, A7.1b, A7.2, A7.4, S1L, S2L, S5L, S5R, S7L, S7R, S8.1, S8.2, M0.1, M1.1, M1.2, P0.1, P1.1, P1.2, P2.1, P2.2, E0.1, E1.1, E1.2, E1.3, E2.1, E2.2.  Scope of changes now appears to include the build out of suite F103 to be Fire House subs as part of this shell plan. It also now includes some changes to suite F101 (added another exit door, hvac and electrical) Reviewed using FFPC 6th edition effective Dec. 31, 2017.
Reviewer: Victoria Vitori 904 209 1748

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

NOTE: Firehouse Subs build out previously submitted and rejected under clearance sheet C18-2140*1.

Wednesday, November 14, 2018 Scope of changes does include the build out of suite F103. It will be a Fire House Subs. Page A0.1 shows it is an assembly with an occ load of 104.

Friday, November 16, 2018 Swapped out pages now show suite F103 as 1600sf mercantile. I re reviewed as mercantile class C.

11/16/2018 VVitori

1) Unable to locate code analysis for suite F103. NFPA 1.1.7.11 Please illustrate occupancy type and compliance with the adopted edition of the Florida Fire Prevention Code. 

Example of items that need to be addressed: Code and editions, Occupancy of structure/project, fire protection system(s) if included, exit sizes, exit numbers, extinguishers, emergency lights, exit signage, address, light weight truss, what will be in there or processes could present other requirements.  

NOTE: Once the occupancy type for suite F103 is submitted. I will then review to check compliance with appropriate occupancy classification. More comments may be added.

Wednesday, November 14, 2018 Addressed on page A0.1. New comments based on newly classified occupancy use of assembly for suite F103 will begin with item number "4".

11/14/2018 VVitori

2) Previously approved sprinkler plans do not reflect the build out and drop ceiling of space F103. Sprinkler plans now need to be revised to accommodate this build out. Revised sprinkler plans will need to be resubmitted as a sprinkler shell revision. The sprinkler revision will need to be received before this building revision is approved.

Wednesday, November 14, 2018 Sprinkler plans are good but I will not approve them until this revision is approved. Want to make sure new comment 4 correction will not alter fire sprinkler plan.

11/14/2018 VVitori

3) Page M1.0 now shows a 5 and 6 ton hvac unit for suite F103.  Unable to locate reference to duct detectors. Please point out.

Air handlers with more than 2000 CFM are required to have duct smoke detectors. If these detectors are concealed they shall have a remote visual and audible indicators located in a normally occupied space. (NOTE if there is a FIRE ALARM SYSTEM in the building the duct smoke detector must also be connected to the fire alarm system. In those cases only a visual indicator is required) (NFPA 90A,6.4.2)

Wednesday, November 14, 2018 I over looked a comment on page M0.1. Architect pointed it out on same page, comment number 19.

11/14/2018 VVitori

4) Looking at page A1.1 it appears there is only 1 exit for the suite 103 assembly. 101:12.2.4.1 requires 2 exits. Please illustrate.

NOTE: 101:12.2.5.2 does not allow egress to be through a kitchen, storeroom, closet or hazardous area.

NOTE: 2nd means of egress will be required to meet 12.2.2.2.3.

Friday, November 16, 2018 Swapped out pages now show suite F103 as 1600sf mercantile. I re reviewed as mercantile class C. Single MOE allowed for mer class c. 101:36.2.4

11/16/2018 VVitori

5) Unsure of floor finish.

Wednesday, November 14, 2018 at 342 I spoke with Monica and she said floor finish will be concrete at this phase.

11/15/2018 VVitori