Plan reviewed for revision. Revised pages: A0.0, A.02, A1.1, A1.2, A4.1, A7.1, A7.1b, A7.2, A7.4, S1L, S2L, S5L, S5R, S7L, S7R, S8.1, S8.2, M0.1, M1.1, M1.2, P0.1, P1.1, P1.2, P2.1, P2.2, E0.1, E1.1, E1.2, E1.3, E2.1, E2.2. Scope of changes now appears to include the build out of suite F103 to be Fire House subs as part of this shell plan. It also now includes some changes to suite F101 (added another exit door, hvac and electrical) Reviewed using FFPC 6th edition effective Dec. 31, 2017.
Reviewer: Victoria Vitori 904 209 1748
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
NOTE: Firehouse Subs build out previously submitted and rejected under clearance sheet C18-2140*1.
Wednesday, November 14, 2018 Scope of changes does include the build out of suite F103. It will be a Fire House Subs. Page A0.1 shows it is an assembly with an occ load of 104.