SJC Home
Clearance Sheet C2016-006384

 Department IssuesSigned OffIntl

Plan REJECTED as a 9393sf Special Use Industrial (NFPA 101) Repair Garage (NFPA 1). Reviewed using the Florida Fire Prevention Code 5th ED.

9/23/2016 sboike

Rejected need clearance sheet.  

 

NFPA 1.30.2.5.1 Are the floors going to be liquid tight. Information/ data sheets needed on the product being used.

 

NFPA 1.2.5.2 Please provide more information about floor drains used.

 

NFPA 1.30.2.7(1) The building height is stated on sheet A3 as 36 feet in height. This appears to meet the requirement for major repair garage over two stories in height requiring a fire sprinkler system.

 

Is there equipment that meets NFPA 1.30.2.8.1?  

 

NFPA 1.30.2.9 Are there going to be return air openings?

 

NFPA 1.30.3.3.1 Are there going to be waste handling tanks?

 

Please address the DRC requirement for the private hydrant.