SJC Home
Clearance Sheet C2016-003978*013

 Department IssuesSigned OffIntl

Plan reviewed for hood in kitchen 16ft grease hood and 4ft hood. Reviewed using FFPC 6th edition effective Dec. 31, 2017.
Reviewer: Sandra Boike 904 209 1741 
Victoria Vitori 904 209 1748
To schedule fire inspections please call 209-1740x1 then 1 again. To leave a message extension 1 then 2.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

* if there are items that are addressed on plan please point it out to the reviewer.

3/12/2018 sboike

RESUBMITTING:
Please make necessary changes and resubmit the complete permit application package.

To help speed the review process you should include a written comment response summary to clarify or illustrate corrections on plans (bubbling, highlighting or notations are best).  Please use the Florida Fire Prevention Code 5th Ed for all code reference in a response to comments. The fire plans examiner does not use the Florida Building Code. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review. Items labled "informational only" are for the contractor.

2/23/2018 sboike

1) The pages with hood information and duct information were printed with words unreadable. Too dark and unable to distinguish the letters. Please provide clear plans.  Review can not be completed.

Friday, February 23, 2018

New pages have been submitted.

2/23/2018 sboike

2) There appears to be two hoods being submitted for. Hood 1 is 16ft long. Hood 2 is 4ft long. Please indicate if hood 2 is a type 1 or type 2 hood.  There is limited information for this hood. Please provide more information.

Monday, March 12, 2018

One hood of each type. 16ft type 1

3/12/2018 sboike

3) Page M 402 and sheet NO 1 indicates 20 gauge steel.  How are you meeting NFPA 96.7.5.1.1.  Please review the minimum requirements for the gauge of steel.

Monday, March 12, 2018

Factory built grease ducts built in accordance with ANSI/UL-198.

3/12/2018 sboike

4)  Page m 402 indicates a fire damper. Please provide manufacture specifications for the damper.

Monday, March 12, 2018

Damper deleted

3/12/2018 sboike

5) How are you meeting the access panel required with in 18" of damper. NFPA 96.7.3.4.

Monday, March 12, 2018

Damper deleted

3/12/2018 sboike

6)  Per page M402 there are bends in duct. No access panel manufactures specifications have been provided. How are you complying with NFPA 96.7.1.4.2?

Monday, March 12, 2018

Plans updated to reflect bends, slope etc

3/12/2018 sboike

7)  Page M402. Reviewer us unable to determine if NFPA 96.7.1.4 is being met? or how are you meeting NFPA 96.7.1.4.3 for drains.

Monday, March 12, 2018

Plan updated and detail given.

3/12/2018 sboike

8) Sheet NO 1 there is a note to "verify  ceiling height" this was not filled in. Please provide the information.

Monday, March 12, 2018

Plan updated information provided.

3/12/2018 sboike

9) Please provide manufactures specifications for filters.

Monday, March 12, 2018

Specifications provided bottom of page M402

3/12/2018 sboike

10) No scale has been provided to determine of NFPA 96.7.4.2.3 has been met for vertical ducts. 10ft access requirement. Page m402

Monday, March 12, 2018

Refer to page M407 sheet updated

3/12/2018 sboike

11)  Provide manufacture specification for any access panels. Illustrate compliance with NFPA 96.7.4.4.1.

Monday, March 12, 2018

Specifications provided on bottom of page M406-407

 

3/12/2018 sboike

12)  Reviewer is unable to determine compliance with NFPA 96.7.8.2.1. Placement of exhaust fan.  No scale has been provided on page M402

Monday, March 12, 2018

Plan revised.

3/12/2018 sboike