Revision REJECTED. It is unclear what changes are being made. The original plan was for 5280 sqft raised roof over existing welding shop. 1848 sqft will be an open air pole barn over existing concrete. The last revision was for concrete footings, structural steel, roof trusses and adding a sink. It appears sqft is being added. A new clearance sheet is required. 5/24/16-A new clearance sheet and plan has been submitted. APPROVED