| | Department Issues | Signed Off | Intl |
|
|
Plan PENDING for 10,085 sqft work release bldg. This is reviewed under 2007 FL Fire Prevention Code as Correction & Detention, Condition Type II.
Please provide a clearance sheet.
|
| |
|
|
The Fire Sprinkler Design Criteria is OK for the building permit, Noted a separate permit will be required for the fire protection systems. A HOLD has been placed on the Building Permit and NO inspection can be done past the slab until this permit is approved. ***Per FAC 61G15-32.002(6) The shop drawings once submitted are not required to be sealed by an engineer and will not be accepted as such. Please submit a unsealed sprinkler shop drawings.*** ENG: Steve Kowabany, NFPA 13 wet Lt Haz except certain areas Ord Haz, Grp 1.
|
5/11/2011
| smurray |
|
|
The Fire Alarm Design Criteria is OK for the building permit, Noted a separate permit will be required for the fire alarm systems. A 102 HOLD has been placed on the Building Permit and no inspection can be done past the slab until these permits are approved. **Please submit unsealed fire alarm shop plans.** Eng: Steve Kowabany
|
5/11/2011
| smurray |
|
|
The UNDERGROUND CONTRACTOR for the installation & hydro test of the fire sprinkler line will require a separate permit. A HOLD will be placed on the building permit and NO inspection past the slab will be done until this permit is submitted & approved.
|
5/11/2011
| smurray |