SJC Home
Clearance Sheet C2011-000101*014

 Department IssuesSigned OffIntl

Plan reviewed for revision showing CO2 system. Reviewed using FFPC 7th edition effective Dec. 31, 2020.

Reviewer: 
Anthony Gedris 904-209-1741 agedris@sjcfl.us
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

4/21/2022 agedris

Based on information from GC about the path of the Gas Lines additional sensors are required in the hallway and in the bar area. The sensor in the hallway should be mounted near where the T in the line is located as this is where a leak is most likely to occur. The sensor in the bar should be located within 15 of the line termination at the kegerator.

4/21/2022 agedris