Plans for a 5199sf interior buildout of an existing space, located in a building that is equipped with fire sprinklers.  The space was designed and reviewed as Mercantile.


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

10/18/2021 PWebb

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.

To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

10/18/2021 PWebb

1) INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating no work to be done to the existing system:

- Sprinkler
- Hood
- Kitchen Suppression
- CO2 alarm

9/13/2021 PWebb

2) As submitted,  the common path of travel as measured from the walk in freezer is ~94 feet.  The maximum permitted is 75'.  NFPA 101:12.2.5.1.1. 

-------------------

Exit signage was modified to include egress through the dining room, reducing the common path to within limits.  PJW Monday, September 13, 2021

 

9/13/2021 PWebb

3) The wall between the proposed space and the pet supermarket must either be a 2 hour wall, or the building sprinkler system must be electronically supervised by a fire alarm system, which includes all sprinkler valves including the backflow preventer.  NFPA 101: table 6.1.14.4.1(a), and 9.7.2.

----------------------------

Response to comments indicates "the building owner's representative stated that the building has an electronically monitored fire protection system.  The system is monitored by Wayne Automatic Fire Sprinklers.  A one-hour wall is all that will be required."

Please note that as indicated above in the original comment, all sprinkler valves including the backflow preventer must be electronically supervised by a fire alarm.  The response was regarding the monitored fire alarm system.  The original comment was regarding supervised valves.  Based on a site visit by the fire inspector supervisor, the backflow preventer is not electronically supervised by the fire alarm system.  A 2 hour wall is still required as originally noted, indicate this on the plans.  PJW Monday, September 13, 2021

-----------------

The wall has been changed to a 2 hour wall using the UL 263 V45 assembly indicated on sheet A-7.  PJW Monday, October 18, 2021

 

10/18/2021 PWebb

4) Ensure that the reclaimed wood indicated meets the interior finish requirements of the code and as indicated on sheet G-1. Provide specs for the product or specs for the product that will be applied to meet this. 

----------------

Specs provided for the product FX Lumber Guard, that will be applied to the wood.  Ensure that it is applied per the manufacturers listing and instructions.  Maintain the empty product containers and instructions on site available to the fire inspector upon request.  PJW Monday, September 13, 2021

9/13/2021 PWebb

5) Provide specification sheets for the used oil tank referenced on sheet A-2.

------------------

Information provided for the Dar Pro used oil receptacle that will be located outside away from the building.  PJW Monday, September 13, 2021

9/13/2021 PWebb

6) A CO2 alarm is indicated on sheet A-2 to be submitted separately by contractor.  A hold has been placed at insulation (109) for this. 

----------

RTC confirms that the C02 alarm system will be submitted separately once the vendor is selected.  PJW Monday, September 13, 2021

9/13/2021 PWebb

7) Info Only

Ensure that the cooler and freezer doors do not require a key, tool, or special knowledge to open from the egress side.  This will be verified during final. 

9/13/2021 PWebb

8) Info only

The front doors are marked as existing on the door schedule.   Ensure that one of the two options are met which will be verified at the time of final. 

-Panic hardware is installed on both doors that releases all locks and latches

- Keyed locking devices are installed on doors.  No latches on doors permitted with this option.  Also ensure that the requirements of 101:7.2.1.5.5 are met. NFPA 101:12.2.2.2.3, 12.2.2.2.4. 

-------------

RTC indicates that front door will have the door to remain unlocked signage installed.  The compliance with the above will be verified at the time of final.  PJW Monday, September 13, 2021 

9/13/2021 PWebb

9) Overall the emergency lighting looks good using the wall mounted and ceiling mounted devices.  Provide specifications, so I can verify coverage.  Ensure you adhere to the spacing, mounting height, and coverage requirements. 

-------------

Specs provided for the Quantum ELM4L light.  Device is well adequate for the spacing indicated.  PJW Monday, September 13, 2021 

9/13/2021 PWebb