Clearance Sheet C2010-000771

 Department IssuesSigned OffIntl

1. Please provide an electrical plan showing the power, lighting, and panel schedule. 

 

8/26/2010 JPAULA

2.  Please provide a HVAC duct layout, including supply, return, exhaust, and makeup air. Include an equipment schedule showing Total cooling (MBH), Sensible (MBH), Minimum SEER, Heating (MBH), Minimum HSPF, Supply Air (CFM), Outside Air (CFM), Static Pressure (in. wc), Motor (HP), Voltage, and  Auxiliary Heat (KW).  Note: Outside air is required to comply with  ASHRAE 62.1. Note: In addition a commercial kitchen hood complying to FBC-M section 506&507 is required with adequate makeup air.

Thursday, August 26, 2010  Item remains open:

 

3.  Please provide a riser diagram for the domestic water and
and sanitary plumbing.

Thursday, August 26, 2010  Item remains open:

 

4. The occupancy load shown on sheet CVR states 46 people and a A-2 occupancy classification. Restaurants with an occupancy load of less than 50 persons are classified as a M (FBC-309.1) Please revise the occupant classification.

8/26/2010 JPAULA