Plan APPROVED to split unit 209 from 208 (902 sqft) for a medical office inside a bldg. protected with fire sprinkler system. This is reviewed under FFPC 5th ed as business.

8/31/2015 SMurray
The scope of work for this project is in the area of an existing fire sprinkler system. A separate fire sprinkler permit is required for any modification to this system. A hold is placed on the Building Permit and no inspections will be done until this Fire Sprinkler Permit is submitted & approved. (NFPA 1,13.1.1.1) 8/31/2015 SMurray