SJC Home
Clearance Sheet C2008-001715*002

 Department IssuesSigned OffIntl

Plan APPROVED for 2 kitchen hoods (9' and 10'6" L). This is reviewed under 2010 Fl Fire Prevention Code.

7/8/2014 smurray

INFO ONLY:

GREASE DUCT LIGHT TEST

The Fire Marshals' Office must witness a light or smoke test prior to the vertical installation of the duct and a second test of the connecting welds once the duct is installed vertical.  
 
Please contact 209-1740 *1 to schedule these inspections. 


7/8/2014 smurray