Clearance Sheet C2008-001618*001

 Department IssuesSigned OffIntl

Please provide an approved clearance sheet.

9/16/2009 jpaula

Please provide a nailing schedule for the wall and roof sheathing.

9/16/2009 jpaula

Please provide product approval for the door.

9/16/2009 jpaula

Please provide the roof truss engineering.

Wednesday, September 16, 2009 Item remains open, please provide  roof truss engineering. Note: If the designer has decided to change the roof to conventional framing, please provide a conventional roof layout including the sizing and spacing of the rafters.

9/28/2009 jpaula

Please add roof sheathing to the building plans. Include type and thickness.

9/16/2009 jpaula

Please revise A2.1a detail 7. to provide uplift between the 4X6 bearing on the 2X6 wall framing.
 
Wednesday, September 16, 2009 Item remains open:

9/28/2009 jpaula