#1

need 2014 energy sheets / see mandatory lighting requirements per 2014 energy code c405

3/18/2016 fbecza

#2

per fl. accessibility code 216.3 directional signage required to direct persons to the accessible rest room

from the customer area to corridor

3/18/2016 fbecza

#3

per fpc 403.1 a service sink is required

3/18/2016 fbecza

#4

wh is listed on elec. panel schedule [cannot locate on plans] tempered water required per fpc 416.5

3/18/2016 fbecza