SJC Home
Clearance Sheet C2007-001882*005

 Department IssuesSigned OffIntl

Plan submitted for modification to land management offices. Reviewed using FFPC 7th edition effective January 1, 2021.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

12/15/2021 VVitori

**INFORMATIONAL ONLY NO RESPONSE NECESSARY:
At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- Wall and ceiling finish will meet Class A, B or C. 101:38.3.3.2.2

- Floor finish shall meet either: a) ASTM D 2859 for carpet and carpet like materials or b) has a minimum critical radiant flux of .1 W/cm2 for non-carpet flooring. 101:38.3.3.3.3.

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.

12/15/2021 VVitori

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

If work is do be done to the fire alarm or sprinkler system make sure to pull respective permit.

12/15/2021 VVitori

Make sure emergency lighting is provided to cover this area. 101:38.2.9.1

12/15/2021 VVitori