SJC Home
Clearance Sheet C2007-001882*003

 Department IssuesSigned OffIntl

Plan reviewed for interior renovation for 607 sf AV media room only. Room 45, 44, 43. Reviewed using FFPC 6th edition effective Dec. 31, 2017.
Reviewer: Sandra Boike 904 209 1741 
Victoria Vitori 904 209 1748
To schedule fire inspections please call 209-1740x1 then 1 again. To leave a message extension 1 then 2.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

2/5/2018 sboike

Hold added for interior finish manufacture specifications meeting NFPA 101:10.2.

* Typically in AV room have some sort of sound block or noise minimizing wall or ceiling finish.

2/5/2018 sboike

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at framing (105) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating no work to be done to the existing system:
- fire alarm system
- fire sprinkler system

Friday, March 29, 2019 I signed off sprinkler hold since Mr. Law was here yesterday speaking with Reviewer Webb. He told reviewer Webb no sprinkler or fire alarm work needed to be done and the interior finish in av room was all sheetrock. Reviewer Webb forgot to sign off sprinkler hold also.

2/5/2018 sboike