| | Department Issues | Signed Off | Intl |
|
|
NOTE: A separate permit will be required for the kitchen hood.
|
8/2/2007
| JNP |
|
|
Provide hotel and restaurant approval.
|
8/2/2007
| JNP |
|
|
Gas riser Sheet M-1 Indicate the inlet pressure. Indicate what type of piping material will be used.
|
8/2/2007
| JNP |
|
|
Provide a one hour listed penetration for the electrical entering the tenant separation wall.
|
8/2/2007
| JNP |
|
|
Sheet M-1 shows an existing 4 and 6 ton unit, the energy form shows 2-5 ton. Please revise the energy form to match.
|
8/2/2007
| JNP |