SJC Home
Clearance Sheet C2007-000692*001

 Department IssuesSigned OffIntl

still need hotel and resturant approval on the plans. Still need as of 4/10/07.

 

still need fault current letter from power co.

4/10/2007 DRS

as the architect and i talked about on the preliminary review per FBC SEC.903.2.1.2 the second story area is required to be fully sprinklered for bar and eating area. THIS IS STILL A BUILDING CODE REQUIRMENT THAT IS REQUIRED. THE MOST STRINGENT CODE MUST BE MEET.