Plan is for sprinkler protection of canopy on 2nd floor. Plans are rejected for the following reasons:

*Plans required to be submitted for canopy
*Eng criteria for sprinkler system must reflect addition of 2nd floor area under canopy


Information only: Sprinkler plans for modification of inside 2nd floor from stairs to lobby still need to be submitted. This can be included with this plan or separate plan.