SJC Home
Clearance Sheet C2007-000576

 Department IssuesSigned OffIntl

fault current letter from power co.

 

metal building plans need to be updated to 2006 FBC.

 

PER TABLE 1016.1 FBC ONE HOUR RATING IS REQUIRED ON CORRIDORS PROVIDE DESIGN DETAILS.

 

PROVIDE THRESHOLD BUILDING PLAN FOR THIS BUILDING. ALSO A PRECONSTRUCTION MEETING WILL BE REQUIRED WITH THE THRESHOLD INSPECTOR BEFORE START OF CONSTRUCTION.

 

PER THE PLUMBING CODE CHAPTER 4 THE WOMANS RESTROOM IS SHORT ONE WATER CLOSET