SJC Home
Clearance Sheet C2007-000077*003

 Department IssuesSigned OffIntl

Plans for the construction of a 1 hour fire wall that is being constructed to divide a existing business into two.  Per conversation with the building inspector there are some issues with the fire wall ie/ul design missing from the plans.  These are being addressed in the field.  Plan approved. 

8/26/2008 PJW