Clearance Sheet C2007-000002

 Department IssuesSigned OffIntl

Plan approved for 2 story 30,638 sq ft bldg. This was reviewed under 2004 Fl Fire Prevention Code as business, assembly and storage.

2/9/2007 SLM
The Fire Sprinkler Design Criteria is OK for the building permit, Noted a separate permit will be required for the fire protection systems. A 102 HOLD has been placed on the Building Permit and no inspection can be done past the slab until these permits are approved. 2/9/2007 SLM
The Fire Alarm Design Criteria is OK for the building permit, Noted a separate permit will be required for the fire alarm systems. A 102 HOLD has been placed on the Building Permit and no inspection can be done past the slab until these permits are approved. 2/9/2007 SLM
The Grease Exhaust Hood noted on this page and several other pages throughout these plans are conceptual. A separate permit will be required by the Fire Marshal. A HOLD will be placed on the building permit and no inspection past slab will be done until this permit is submitted & approved. 2/9/2007 SLM
The Grease Exhaust Hood requires a FIRE SUPPRESSION SYSTEM. The Fire Marshal's Office requires a separate FIRE SUPPRESSION PERMIT and a HOLD will be placed on the building permit whereby NO INSPECTIONS past slab can be done until this permit is approved. 2/9/2007 SLM
Consult with your fire extinguisher contractor for the portable fire extinguisher requirements for this occupancy.(FS 633.061) 2/9/2007 SLM
Please provide building numbers that are a minimum of 6-inches high on the building and/or suite(s) for commercial. These must be visible and legible from the street, therefore the address number may need to be larger than the minimum 6". NFPA 1, 10.13.1.2 2/9/2007 SLM
The UNDERGROUND CONTRACTOR for the installation & hydro test of the fire sprinkler line will require a separate permit. A HOLD will be placed on the building permit and NO inspection past the slab will be done until this permit is submitted & approved. 2/9/2007 SLM