These are resubmitted plans that address provious comments (3/24/06). Based on our review all previous comment have been addressed and the plans are approved with the following comments added to the plans: 1. Page 1A0.1, A seperate fire sprinkler permit is required for this project and a hold is placd on the building permit. No inspection will be performed until this fire sprinkler permit is submitted & approved. 2. Page E0.1, A seperate fire Alarm permit is required for this project and a hold is placd on the building permit. No inspection will be performed until this fire alarm permit is submitted & approved. 3. Page E2.1, Please verify that the emergency light provide 1-foot candle of illumination on the floor of the exit path. Additional lights may be required at final based on a performance test of these lights. 5/15/2006 JJR