This plan is a scope of work, for the movement of 1 sprinkler head on an existing system. The plan is APPROVED as submitted.
|
8/18/2005
| PJW |
|
|
Note to Inspector: (attn: contractor)
Verify the following at time of inspection:
- The job copy of the “Scope of Work” stamped by our office is on site.
- 2 copies of As-Builts are on site
-Verify that the As-Built matches the work performed and meets applicable codes.
(Note: as built will not be stamped by our office.)
After inspection is approved, please return one copy of the As Builts to a plans reviewer for processing.
|
8/18/2005
| PJW |