SJC Home
Clearance Sheet C2005-001743*010

 Department IssuesSigned OffIntl
Plans approved for swimming pool. Post occupancy load signs for deck: 115, pool: 23 people. 10/8/2005 SLM
Gates shall not require a key, special tool or knowledge to open from egress side. Also locks shall be no higher than 48 inches from the ground. 10/8/2005 SLM