SJC Home
Clearance Sheet C2004-005747

 Department IssuesSigned OffIntl
A conference call with the architect, engineer, contractor and me took place on 7-20-05. At that time the discussion was to eliminate the Business/Sales office on the top level of this building and as a result all buildings (5, 6, & 7) will come back in with the accumulation of issues reviews for all these buildings resolved and corrected. 2/2/2006 WJD