| | Department Issues | Signed Off | Intl |
|
|
Provide component and cladding chart designed to 120 B exposure partially enclosed. Plans included enclosed chart, need partially enclosed B exposure.
|
| |
|
|
Provide uplift schedule for conventional framing.
|
| |
|
|
Provide nailing schedule for all uplift connections shown on plans.
|
| |
|
|
Supply air and return air are not balanced. Please revise to comply with SMC 403.1 and 601 and resubmit.
|
| |
|
|
Provide outside air to comply with FMC 403.2.
|
| |
|
|
Indicate location of shearwalls and overturn connections and provide fastening schedule.
|
| |
|
|
Provide top plate to bottom plate uplift connections.
|
| |
|
|
Indicate length of anchor bolts and size of washers.
|
| |
|
|
Provide header and uplift schedule for headers.
|
| |
|
|
Provide uplift connections for 4X4 posts.
|
| |