SJC Home
Clearance Sheet C2003-005472*002

 Department IssuesSigned OffIntl

Revision for the addition of a roof platform. 


 

 
 

Please supply a flashing detail for the angle iron supports passing through the roof.

 

1/17/2007 JNP

Please supply a signed and sealed letter from the truss engineer. The letter must state that the top and bottom cords and webs can be drilled with 1/2" diameter holes and that the truss is capable of supporting the additional load of the platform.

Wednesday, January 17, 2007 Item remains open: Please provide a letter that states that the top and bottom cords and webs can be drilled with 1/2" diameter holes and that the truss is capable of supporting the additional load of the platform.


Wednesday, February 07, 2007 Received fax truss revision from James Lamoureux. Called James and informed him that the drilling of the top and bottom cord and webs had not been addressed.