This revision was not originally routed to the Fire Marshal's Office. The Office copy is not stamped with FM office approval.

Revision APPROVED to add a wood framed walkway connecting the existing church to the new church, both of which are protected with fire sprinkler system. Per NFPA 13, 8.15.7, the walkway is required to be protected with fire sprinkler system. A HOLD has been placed for NO Bldg Final until the revision to the fire sprinkler system is submitted and approved.

2/9/2016 SMurray