SJC Home
Clearance Sheet C2003-003902

 Department IssuesSigned OffIntl
1. Have the Mechanical Engineer sign and sealed drawing.  
2. Show location of fire damper on drawing.  
3. The AHU-3 systems has a return and supply duct in corridor.  
4. The return air for units AHU-1 & AHU-3 appear to have the return air ducts connected together please check. Also units 2 & 4 appear to be the same way.