| | Department Issues | Signed Off | Intl |
|
|
Provide the structual schedule in larger print. (size of notes is OK)
|
| |
|
|
Must have a smoke detector inside each bedroom. (NFPA-72)
|
| |
|
|
Must submit an approved DRC site plan
|
| |
|
|
Provide a completed DRC clearance sheet for this project.
|
| |
|
|
Provide water/sewer availability letters.
|
| |
|
|
Provide the Fault Current Letter from the power company. No electrical permits
will be issued until submitted and approved.
|
| |
|
|
The Notice of Commencement must be submitted to the building dept. prior to any inspections.
|
| |
|
|
Provide the engineering for the precast lintels to be used and the
mininum bearing.
|
| |
|
|
Must provede the information listed in FBC 104.2 and 1606.1.7 (5).Provide the
information for the windows to comply with the code, note that this building is
located in the wind-borne debris area and will require impact-resistance glass
or engineered shutters.
|
| |
|
|
Provide two (2) sets of truss drawings with a layout sheet. The layout
sheet to be signed by the structual engineer of record that he/she has
reviewed the truss drawings and they meet his/her design requirements.
Include a schedule for the uplift connectors required including number
of fasteners for each connector.
|
| |
|
|
The Building Valuation increase is based on the data compiled by SBCCI & ICC
using the Marshall Valuation Service as published by the Marshall and Swift
Publication Company and printed in the Southern Builder.
|
| |