SJC Home
Clearance Sheet C2002-004924*001

 Department IssuesSigned OffIntl
Within the comments there will be items that need to be addressed before we can approve the permit, and comments that are informational. Informational comments will be started with "FYI", and will be signed off, any comment that will require your responce will start with "ACTION". 2/9/2004 ROD
3. The emergency lights are required to provide 1-footcandle of illumination on the floor along the exit path. This requirement is subject to a performance test conducted prior to the final. Additional Lights may be required. 2/9/2004 ROD
All doors that have dead bolts shall use thumb type single cylinder. 2/9/2004 ROD
Panic hardware is reqired on exits with more then 100 persons.  
Please post the Occupant Load in a visible location within the building. 2/9/2004 ROD
The Grease Exhaust Hood requires a FIRE SUPPRESSION SYSTEM. The Fire Marshal's Office requires a separate permit and a HOLD will be placed on the building permit whereby NO FRAMING INSPECTION AND NO FINAL EXHAUST HOOD INSPECTION can be done until this permit is approved. 2/9/2004 ROD
Consult with your fire extinguisher contractor for the portable fire extinguisher requirement, pay special attention to the requirement of a K type extinguisher that is required in the cooking area. 2/9/2004 ROD
Air handles with more than 2000 CFM is required to have duct smoke detectors. If these detectors are concealed they shall have a remote visual and audible indicators located in a normally occupied space. (NOTE if there is a FIRE ALARM SYSTEM in the building the duct smoke detector must also be connected to the fire alarm system. In those cases only a visual indicator is required) 2/9/2004 ROD
FYI: Please provide building numbers that are a minimum of 6-inches high on the building and/or suite(s). 2/9/2004 ROD
Please consult with your fire extinguisher contractor for the portable fire extinguisher requirements for this occupancy.(FS 633.061) 2/9/2004 ROD
Provide a written letter to this office as to what and when the classroom areas will be used. The review will not be completed untill this requirement is approved.